Demo is underway inside Parrington!  The crew is focusing on demolition in the attic (above the fourth floor), the basement mechanical room (adjacent to the student lounge), and the fourth floor first.  Then they'll move to the third floor, second floor, and finally first floor as they complete the demolition work.  It's loud and exciting work to see!

Main Entry - This will be the last place to be demolished.Main Entry - This will be the last place to be demolished.

Former Student Services Suite (109)Former Student Services Suite (109)

Saving the Alaskan white marble for reuse in the remodeled buildingSaving the Alaskan white marble for reuse in the remodeled building

Fourth floor PhD office Fourth floor PhD office

Discarded venting and insulation from attic (above fourth floor) being held until the external trash shoot built Discarded venting and insulation from attic (above fourth floor) being held until the external trash shoot built

Fourth floor, SE Facing Fourth floor, SE Facing

Removing walls on fourth floor Removing walls on fourth floor

Demolition in progress in formal Fiscal suite on floor three:

Walls being removed on the fourth floor in PhD suite: