February 27, 2020

Video of the drywalled Student Lounge (ground floor of Parrington)!

Video begins at the ramp down to the lounge. Upon entering, the restroom and the shower room can be seen. Further into the lounge, you can see where the kitchen has been roughed in and then where the new hallway/staircase is to head upstairs to Parrington first floor. Final room seen in the video is a classroom (formerly 108), with its newly un-bricked windows.